Typical consent services:

Negotiate and complete temporary licence agreements for access routes and site compounds.

  • Adopt client wayleave and easement agreements, completing them based on standard industry agreed rates
  • Negotiate Heads of Terms and assist in completion of Option Agreements for leases or purchase of Substations, Gas Governor Stations, Cathodic Protection Cabinets, Battery Storage Sites, Well Sites, Windfarm Sites, Telecommunication Masts, Pumping Stations, Outfalls and Solar Farms
  • Assist in routing and completing Options for Linear Projects. Follow up work to complete Leases, Easements and Leases of Rights for Road Widening, Cable and Pipeline Routes

Land rights for infrastructure development

FGP are familiar with the varying types of “ownership” that a developer might look for. There are various legal vehicles used to hold the land rights needed for infrastructure development. These “vehicles” go in and out of fashion as new influences come into play and the legal teams continue to develop them. The variations might, for example, relate to Stamp Duty Land Tax (SDLT) or land law.

Purchase of Freehold

Freehold purchase is most often used for land intended for buildings including block valve sites, pumping stations and sub-stations. It is used in situations where a hand back to the original owner might be difficult if reinstatement is involved. It gives flexibility to upgrade the facility without further consent, but may involve a higher price on the initial purchase with capital taxation implications a further complication.

Leases

Leasing property gives possession of property for a fixed term and can be preferred as a cheaper or more flexible alternative to freehold. Many lease contracts have break clauses built in allowing flexibility if business operations change during the term of the lease.

It is possible to implement a subterranean lease for cables or pipelines as an alternative to the easement option discussed below. Apart from the lower degree of permanence this provides an alternative on linear projects where land ownership at either end of an easement is uncertain.

Leases almost inevitably require the property to be returned to its original state, which can prove costly. It is though, a penalty that occurs at the end of an asset’s productivity rather than the cost of front loaded premium offers for freehold.

Easements

An easement provides the right to use another person’s land for a stated purpose. They are common in private arrangements for water supplies and rights of way between properties. For utility infrastructure, an easement, once purchased, can restrict the landowner in various ways including building or access.

Option Agreement

An option agreement is between the landowner and a potential developer. It gives the developer the “option” to purchase the land or rights in the land at a future date on agreed terms.

Typically, an option period is 3 to 5 years giving the developer time to obtain permissions for the proposal and prove its viability before committing. The option amounts to a charge on the land, so that the owner cannot alter or restrict the land within the option period. An option fee is paid at the start of the option period and is non-returnable in most circumstances.

An option agreement is possible on Freehold proposals, leases and easements.

Wayleaves

An unusual concept used most commonly by electricity companies and telecom cable companies. A wayleave is linked to the signatory, usually the landowner, and not the property itself. This means it does not necessarily run with a change of ownership. Although a landowner can terminate a wayleave agreement there are statutory powers in the background that would usually ensure continuity other than for specific reasons.

Licenses

Used for short term access to land most usually for surveys and preliminary exploration. A licence does not create a legal interest in land. It is a permission to use the premises for a particular purpose and can be fixed term or ongoing. A licence does not
grant exclusive possession.

FGP are well acquainted with all the possible variations of acquisition on behalf of infrastructure developers. Negotiations are conducted with the certainty of obtaining the land or rights by agreement and without resort to compulsory powers.