Infrastructure planning
Infrastructure planning is often governed as much by specific Acts of Parliament (eg the Electricity Act) as the Town and Country Planning Acts. This niche work is not familiar to mainstream professionals more familiar with residential and commercial property applications than the specialist area of infrastructure; FGP fill the gap as specialists.
Infrastructure assets where a planning application may apply:
-
Substations and valve sites
-
Peaking stations
-
Solar panels
-
Wind turbines
-
Battery Storage
-
Low voltage overhead lines
-
Roads and Highway entrances
-
Telecommunication Masts
Development rights
There are significant levels of permitted development rights most particularly for Statutory Undertakers. FGP’s initial role in planning is to identify the correct planning route for the asset concerned. The proposal will be assessed to see whether proposals sit within permitted development rights criteria where a full planning application will not be
required; it may though require notices. In addition, certain limitations apply to permitted development powers in environmentally sensitive designated areas, which then brings the proposal back into the full planning arena.
Ensuring that planning applications are submitted correctly
FGP has a strong team of Chartered Surveyors, backed up by the GIS & Mapping department, to ensure that planning applications are submitted correctly and with the necessary accompanying information. This avoids delays that occur when a planning authority asks for further information on the end of the consultation period. An important part of this is to ensure the correct planning fees are applied and any Section 106 obligations carefully checked.
The FGP team will advise on design considerations for structures, landscape works, flood risk and other works of mitigation. Part of the preparation might include preapplication local consultation.
Pre-application consultation with the Local Planning Authority is often undertaken when the proposals will be considered against the policies of the “development plan,” unless material planning considerations indicate otherwise.
Section 115 of the Planning Act 2008 provides that, in addition to a main “principal development”, consent may also be granted for associated development. FGP will advise when this approach may be appropriate.
Applicants may also need to obtain other consents or licences before commencing works at or near rivers, canals, railway crossings, environmental or archaeologically sensitive sites or if works will affect protected animals and habitats.